| YEAR | CLIENT | VALUE (RM) | ASSIGNMENT
|
|---|
| 2002 | KHI Construction (M) Sdn Bhd | 8 million | Preparation of shop drawings, fabrication, painting and delivery to site of structure for heat recovery steam generator and air cool condenser to Gelugor Power Plant. |
| 2002 | Tunas Selatan Consortium Sdn Bhd | 50 million | The design, construction, equipping, commissioning and maintenance Hospital Sg. Buloh (620 Beds) and the College of Allied Health Sciences at Sungai Buloh, Selangor Darul Ehsan. Work Package: Main Hospital Complex Comprising Piling, Structural and Roofing Works (Design & Build) |
| 2001 | DSD Construction Sdn Bhd | 21 million | Preparation of shop drawing , fabrication, painting and delivery to site of structure to TNB Janamanjung Power Plant, Boiler Package. |
| 2000 | Invesco Dumez Jaya - Who Hup JV | 10 million | Preparation of shop drawing, fabrication, delivery to site, erection and painting of structure for Berjaya Times Square. |
| 1999 | Takenaka (M) Sdn Bhd | 4 million | Preparation of shop drawing, fabrication, delivery to site, erection and painting of structure for Asia Pacific Polyplastic. |
| 1999 | Tenaga Nasional Berhad | 3 million | Design, fabricate and supply of substation structure for TNB in Northern Kedah and Negeri Sembilan |
| 1999 | Tenaga Nasional Berhad | 10 million | Design, fabricate and supply of 33kV distribution pole for TNB (3000 poles) |
| 1999 | Tenaga Nasional Berhad | 1 million | Design and supply of substation gantry for TNB |
| 1999 | Tenaga Nasional Berhad | 1 million | Design, fabricate and supply of structure for TNB Southern Region substation. |
| 1998 | Pesaka Gammon | 6 million | Design, fabricate and supply of structures for Securities Commission Head Quarters. |
| 1998 | Lion Sankyu Tekko Sdn Bhd | 8 million | Integrated steel product plant for Megasteel project. |
| 1998 | MHE-Demag Logistic (M) | 4 million | Roller Deck Side Beams for MHE-Demag in KLIA. |
| 1997 | Cleveland Eon Asia Sdn Bhd | 7 million | Fabrication and erection of structure works for Negeri Sembilan Cement Plant. |
| 1997 | Hyundai Engrg & | 3 million | Design, fabricate and supply of structure pipe racks to LPG Bintulu facilities. |
| 1997 | MHE-Dematic Logistic (M) | 6 million | Racking Structure for storage of pallets for MHE-Demag in KLIA |
| 1997 | Truetech (M) Sdn Bhd | 1 million | Structure stage for Panggung Negara. |
| 1997 | Projek Lebuhraya Utara-Selatan Berhad (PLUS) | | North South Central Link - Package 2A - Guardrail works. |
| 1997 | Bombardier (M) Sdn Bhd | 3 million | Kuala Lumpur LRT 2 - metal parts |
| 1997 | Cellular Communications Network (M) Sdn Bhd (CELCOM) | 3 million | Design and supply of telecommunication towers to Celcom |
| 1997 | Reel Asia (M) Sdn Bhd | 1.2 million | MAS/KLIA Ground Support facilities,Sepang Bridgecranes & Teleplatform for Reel Asia. Fabrication & installation of crane Beams and mechanical equipment |
| 1996 | TIME Automation & Management Services Sdn Bhd | | North South Central Link - Package 1A - guardrail works. |
| 1996 | TIME Automation & Management Services Sdn Bhd | | North South Central Link - Package 1A - street lighting works/highmast. |
| 1996 | Bina Puri Sdn Bhd | | North South Central Link - Package 1B - guardrail works |
| 1996 | Bina Puri Sdn Bhd | | North South Central Link - Package 1B - street lighting works/highmast. |
| 1996 | Projek Lebuhraya Utara-Selatan Berhad (PLUS) | | Shah Alam Expressway - Package A - Guardrail work |
| 1996 | Telekom (M) Berhad | 2.5 million | Design, fabricate and supply of telecommunication towers for Emartel |
| 1995 | Cellular Communications Network (M) Sdn Bhd (CELCOM) | 4 million | Design,fabricate and supply of telecommunication towers for Celcom (M) Sdn Bhd |
| 1995 | ABB Power Generation | 1 million | Design, fabricate and supply of transmision towers for ABB Power Generation Sdn Bhd. |
| 1995 | TIME Highway Radio Sdn | 1 million | Design,fabricate and supply of radio tower for Radio Lebuhraya Sdn Bhd TIME Highway) |
| 1995 | Cellular Communications Network (M) Sdn Bhd (CELCOM) | 4.5 million | Design, fabricate and erect of telecommunication structure for Celcom (M) Sdn Bhd |
| 1994 | Cellular Communications Network (M) Sdn Bhd (CELCOM) | 1 million | Design, fabricate and install of steel monopole structure for the proposed Penisular Malaysia telecommunication project. |
1990 to 1993 | Projek Lebuhraya Utara-Selatan Berhad (PLUS) | 120 million | North South Expressway - Design, fabricate, supply and install of highway furniture namely guardrails, lighting column and high mast for North South Interurban Toll Expressway |
| 1993 | JGC Corporation | 1 million | Galvanising works of fire fighting pipe spools for MNLG 2, Bintulu |
| 1992 | Malaysian Shipyard Engineering | 1 million | Design and fabricate for galvanising structure to EPG Oleochemical Plant, Kuantan |
| 1991 | Tenaga Nasional Berhad | 4 million | Design and fabricate for galvanising substation structure for TNB at Connought Bridge Power Station. |